Email Us

Charging Pile Fitness Requirements

As the electric side of the distribution of electric power network, the characteristics of the automatic communication system are determined by the particularity of the structure of the charging pile (plug) of electric vehicles, which is characterized by many and scattered measured points, wide coverage and short communication distance. In addition, with the development of cities, network topology requires a structure with flexibility and expansibility. Therefore, the following issues should be considered in the selection of communication mode of EV charging piles (plugs) :


Reliability of communication 


Communication system to withstand harsh environment and strong electromagnetic interference or noise interference test for a long time, and maintain smooth communication.


Construction cost 


On the premise of satisfying reliability, the construction cost and the cost of long-term use and maintenance should be considered comprehensively.


Two-way communication 


Not only can realize the information upload, but also realize the control of the amount of down.


Multi-service data transmission rate


With the continuous growth of terminal business volume in the future, the communication between master station and sub-station and sub-station to terminal has higher and higher requirements for multi-service data transmission rate.


Flexibility and expansibility of communication 


As the charging pile (plug) has the characteristics of multiple control points, wide areas and scattered, standard communication protocol is required. With the development of "ALL IP" network technology trend and the continuous growth of power operation business, ip-based service bearer needs to be considered. At the same time, it should be convenient for installation, construction, debugging, operation and maintenance.


Charging Pile Fitness Requirements

EV Charger
Latest News About Max Power EV Chargers
As the electric side of the distribution of electric power network, the characteristics of the automatic communication system are determined by the particularity of the structure of the charging pile ...
The Construction of Electric Vehicle Charging Stations in China
2023-08-14
The Construction of Electric Vehicle Charging Stations in China
The Significance of Electric Vehicle Charging Station Construction in ChinaAs the world strives to reduce greenhouse gas emissions and combat climate change, the construction of electric vehicle (EV) ...
Read More
Bike Charging! The Electric Car Charger Innovatively Solves the Travel Problem!
2023-08-03
Bike Charging! The Electric Car Charger Innovatively Solves the Travel Problem!
Efficient and Convenient - The Advantages of Electric Car ChargersElectric car chargers have become a game-changer for travelers seeking a reliable and convenient means of topping up their vehicle'...
Read More
DC Charging Pile Manufacturer
2023-08-14
DC Charging Pile Manufacturer
Leading the Charge in the Future of Electric VehiclesAs the world transitions towards a greener and more sustainable future, the role of electric vehicles (EVs) becomes increasingly vital. And at the ...
Read More
Contact Us
Add
No.5,Nanjiang 2nd Road, Nansha District,Guangzhou,Guangdong Province,China
No.5,Nanjiang 2nd Road, Nansha District,Guangzhou,Guangdong Province,China
manager@mxpcharger.com +86-20-28187883